Hi, I constructed an Absco 3m x 3m garden shed on an existing concrete slab as a DIY (totally new to DIY, and highly inexperienced). With the build complete (sparing a few minor issues), I am now looking for steps to seal the edges of the shed, so as to prevent any water ingress when it rains.
Absco recommend the shed be built with the edges on a recessed concrete slab to prevent this, which wasn't an option as i wasn't sure which shed i was getting when the slab was laid years ago. Question is, how do i seal the inner edges of the shed?
Some pics of the shed and issue attached, looking for inputs from the community.
@bennyboy good to see you have the bodyboard ready to go though 😉.
Don't forget you can check with a hose running water on the roof and across the roof and on the doors for controlled flow to try to track it down.
Pain the the @@s but your almost there keep going.
Carl
Hi Ben I have the same issue with water entering under door. I have sealed the entire inside base with Sikaflex. How did you solve your issue
Hello @jbellerby,
Welcome to the Bunnings Workshop community. Thank you for joining the discussion.
Our last recommendation about the leaking door was to put in an aluminium angle at bottom of the frame so that the door would sit on it and any rain that came in would be guided out at the bottom. Let me tag @bennyboy to make them aware of your question.
If you need further assistance, please let us know.
Eric
Thank you Eric. Do you have a photo? And what size angle?
Just trying to workout how the angle works with the bottom door latch. can you still open second door
Hi mate, I still have the issue as I didnt get around to implementing any of the final suggestions provided by EricL and the team.
This is after the rains we had in Brisbane this morning.
I believe in addition to the issue with just the water making its way in from around the door, there is also the fact that concrete being porous absorbs the water falling on it, and manifests itself as wet surface as seen here. This means that even if there is no water physically entering, the rain water which is draining out via the channels on the bottom edges seep into the concrete and show up as being wet. Please correct me if wrong.
Hello @jbellerby
If you go back to the second page of this discussion, you'll see an excellent render and an explanation by @MitchellMc. The angle piece he was referring to was the Metal Mate 25 x 12 x 1.6mm 3m Aluminium Unequal Angle. I'll re-post the image below.
If you need further assistance, please let us know.
Eric
Thank you I have fitted a piece
Hi Eric what size rivits should be used. Not sure of the thickness of bottom rail. Angle is 1.6mm thick thank you
Hi @jbellerby,
Otter 4.0 x 4.8mm Open Aluminium Blind Rivets should be in the right ballpark. They have a grip of 4.8mm, so it gives you 1.6mm for your angle and 3.2mm to capture the bottom rail. I can't imagine the rail would be that thick, but the rivets should still grip solidly if it's thinner.
Please let me know if you have any questions.
Mitchell
Workshop is a friendly place to learn, get ideas and find inspiration for your home improvement projects
We would love to help with your project.
Join the Bunnings Workshop community today to ask questions and get advice.