The Bunnings Workshop community can help with your home improvement projects.
We bought a very dated 70's home with great potential but needing a LOT of work, because the challenge was to completely transform each closed in space into a continuous open flow that would also maximise the ocean views. There wasn't a wall that wasn't going to be impacted in some way.
When planning a full renovation to this scale, each room change impacts others so, there needs to be thought in to the order to which to do first. In most cases it requires temporary (which means months in real life) disruption to neighbouring rooms in order to complete the main project at hand.
In this case, the diving wall between the main bathroom and dining needed to be partially removed and rebuilt. A small diving wall to the kitchen also had to be modified, as that space was also being worked on.
So here is what it looked like and how we transformed it . . . . . . . .
Drill
Tape measure
The first step was to hang drop sheets to protect the other rooms from debris as I needed to remove a section of the floor tiles back to the yellow tongue as I intended to extend the wall in to the dining room to make the kitchen bigger. I used a grinder with a diamond wheel to score a square section of 4 tiles and underlay and then pry them up as best as possible to reduce cleanup.
The split AC unit was disconnected by a plumber so I could remove it. I had already had both ducted heating and an Evap system installed.
There was a small linen closet that was half taken up by the original return air vent for the ducted heating. So I deleted that for just the vent. The top cavity space was then to be repurposed on the other side for the future WIR reno.
The headers above the doorways were removed and the openings taken to ceiling height to create the open flow between rooms and spaces.
Next was to replace the old slide door and sliding widow with new colourbond finished ones and change the window to a more practical awning opening.
My wife and I love our red wines, so it was a no-brainer to include a wine rack and make a feature out of the space.
When I boxed out the new wall I incorporated a cavity which will have the wine rack on one side and provide the additional space required for our fridge on the kitchen on the other side.
Sparkies were called in do the rewire before I hung the plasterboard and stopped it up. I used a plasterer mate of mine to square set the cornices which I had removed and the external corners to get a real sharp finish outside my skillset.
I bought timber veneered panels that I then used to build the wine rack.
I love feature lighting so, an LED light strip was installed in the purpose built cavity above and connected to a TAPO smart plug being part of our smart home system. It was programmed to come on as a night light and set times am and pm.
I had pre ordered stone bench tops for the kitchen which I paid for long term storage to hold the rise price until I was ready for them. I lucked out and there was enough to have cut and polished to fit in my wine rack cavity.
I then installed a semi-translucent backing glass to enhance the lighting.
Next was to install the floating floorboards and skirting just to cover the dining area. Eventually it would extend around the kitchen and small top of stairs hall through in to the living space.
I chose a composite product with an integrated rubber underlay. These boards were mitre saw blade killers. As in very abrasive and dulled the blade very quickly and added additional unexpected replacement,ent costs.
The challenge in laying these boards was it needed to be mm perfect in a 360deg path where 3 floor spaced meet the fourth and will click in to place with just a tape measure! Dining split throughout the kitchen and hall and then meeting up in the living room.
I used a 2400mm level to check for high spots in the tiles as I floated the floor directly on top. High spots were honed down with the grinder and a dual diamond cup disc.
You might be thinking why not lift all the tiles? Well they went throughout the entire top floor with exception of the 4 bedrooms. So they were staying!
With the floor done, skirts and arcs were installed and painting finished the job.
The photos show sneak previews of the hallway and kitchen makeover projects yet to be shared.
Hi @Nailbag,
Congratulating you on a fantastic project is starting to become one of the highlights of my weekend.
You've created a magnificent open space, with abundant natural light to compliment the beautiful timber pieces.
The custom wine cabinet is fantastic and I'm sure you and your wife are glad to have it.
I can say from experience that getting a perfect finish with flooring that runs between so many different spaces is no small feat. Then you add in the floor vent just to make a difficult job even harder.
You've clearly taken the time to do the job right and the results speak for themselves.
Thank you for sharing another fantastic project.
Jacob
Appreciate the feedback @JacobZ. I have to admit I was more than surprised that when the boards finally met that they clicked in to place, albeit some friendly persuasion and liquid nails was r required to get them to bond.
Regards, Nailbag
Wow! What a beautiful Reno. What a breath of fresh air. Awesome job. Look forward to seeing the rest
Man O man @Nailbag
Damn... looks like a newly built place! Display home level. Seriously what you have done just makes me want to roll on through my place and try and keep up! lol
Love the floor and didnt realise it was a floating floor until the end pictures Nice work!
The wine alcove and the steps behind look stylish, cant wait to see those steps btw! When was your house built? You have done a major lift to the place!
What a difference!
Last question Well for now lol How long did it take to do?
Dave
Hey thanks very much for the compliments @Dave-1
The house itself inside and out has been a project that I severely underestimated the volume and complexity of work. Pre-purchase I walked around looking at rooms and listing in my head, things I would and could do myself. Stupidly there was about 9 toilet rolls of paper to make that list!
When your doing whole of house renovations while living there, there needs too be an order to which rooms are worked on and in some order or partly concurrently as changes impact other areas. In this case, the dining room and kitchen impacted each other. A wall in the dining room impacted with the master bath and the floor impacted every rooms except for the carpeted bedrooms.
So, the dining room itself was fairly basic so, was probably a few days. But it was months before total completions because of those other factors.
The house was built early 70's. But it was hard to know for sure, because when I applied for the original plans there were 2 and vastly different. The original would have been a much better version!
I can PM the original and after real estate links if you like.
Nailbag
Evening @Nailbag
I know that feeling of impacting one room and then another... How to keep a household running while renoing would be a good horror story lol (my dining room was out of action for 3 months last kitchen/dining room reno. Well not all of that but that was the total rollover time)
My house was built in 68, only reason I know this is because the neighbour down the street has told me so I really like old houses and what can be done and yours is the perfect example of that.
Would be interesting seeing what was and what is But really your photos do it justice and cant wait to see the other projects when you post them!
Dave
Tried PM you but your username doesn't come up Dave 🤔
Workshop is a friendly place to learn, get ideas and find inspiration for your home improvement projects
We would love to help with your project.
Join the Bunnings Workshop community today to ask questions and get advice.