Thanks, MItchell. Sorry for the unclear message. It's alfresco ceiling, semi attached to the building (two side attached the house) with tiles roof. ...
Greatly appreciated! I have more questions though:1. I have read some articles about Table 4.2.2 AS/NZS 2589 2007 citing there is no requirements to u ...
Thank you so much. You are absolutely right. If I built my house, I would go to the best options no matter if it's overly done. Sadly, the builder bu ...
Thank you so much for your advice!! The house was built in 2008, and a plumber was working on the roof found no back-block and a missing adhesive. Whe ...
Thanks, that's very helpful. Gyprock Leve 4: when you do the installation, it seems adhesive not mandatory, am I right? Also the back-lock, only 3 or ...
Hi guys, I have another question regarding the installation of a gyprock plasterboard for the garage ceiling: Is Gyprock Level 3 Finish the right leve ...
The structure roof is okay, tiles lined well. The insurance plumber found the sarking underneath the tiles was deliberately damaged during the constru ...
We have a alfresco area, the plasterboard ceiling was observed with some water stain following a storm event. there is no issue for any other thing, a ...
Hi @emmab1986,
I've been advised by our plasterboard supplier that water staining can occur on internal and external plasterboard if water accumulat ...