Thanks Mitchell. Taking your advice I'm going to dig in rather than fill and doubled the depth of every step. I figure the material that's removed at ...
@Noyade this looks like it could also work. @Brad we're thinking about changing up the front including the deck so matching is not too important for ...
Thanks Mitchell - I'll take your suggestion on board. This way would be simpler but makes the switchboard even higher, although admittedly not much wo ...
Hi All, I'm looking to change my sloped side path into paved stairs to make it safer, and also to get easier access to the switchboard. After a bit of ...
Welcome to the Bunnings Workshop community @bbrodriguez. It's sensational to have you join us, and many thanks for your question about constructing a ...
My back is rubbish and I will avoid using a shovel at all costs. Amateur suggestion below.... I would follow the natural slope line with treated sleep ...
Some random thoughts...I can see the idea of raising the area for access to the meter box, it does have issues with retaining the filling.Digging in w ...
Thanks Mitchell. Taking your advice I'm going to dig in rather than fill and doubled the depth of every step. I figure the material that's removed at ...
Hi All, I'm looking to change my sloped side path into paved stairs to make it safer, and also to get easier access to the switchboard. After a bit of ...