After digging up and replacing my stormwater pipes I needed to replace the old concrete pathway. I was REALLY reluctant to put concrete back down afte ...
Since I was procrastinating about working on my patio I decided to finally put the next stage of my path into place.
I didnt have any gravel left ov ...
As the front yard has a reasonable slope on it from the back gate and front step area I needed to either backfill a large area and then install a reta ...
This is part two of landscaping the front yard, the bed of the path had been put into place with compacted clay, the culvert and area for a small hold ...
After redoing the sewage pipes and then the stormwater pipe replacement my Front yard was in a mess.
I had a large quantity of clay left over from d ...
After having the sewage done and redoing my stormwater pipes (they had compacted over the years in multiple areas) the steps I originally had were in ...
I had planted a coffee tree a year ago and the winds in my area are fierce. I Figured another wind break but this time made out of Gabion baskets.
I ...