This is an old Kitchen rebuild project from 2009 I have Ummed and ahhed about posting it as the photo quality isnt the best. But decided if it helps showcase the steps for a full kitchen rebuild then why not :smile:

The previous kitchen was a 70's themed one that was all particle board and built in place. 

The underlay of the lino in the kitchen was masonite and heavy duty staples...

The underlay in the dining room was a rubber fuzzy type deal that was glued to the floor. 

 

 

 

Materials

Mmmm Thinking wayyyy back

Kaboodle Cabinets and associated parts all from Bunnings

Stove was an Omega (picked it up on special)

Paint Olive green (forget the brand, tho prob Dulux)

Paint Celery green (forget the brand, tho prob Dulux)

Plastic sheet paint protector

New two bowl Sink from Bunnings

Ceaser Stone Benchtop 20mm thick (ish)

Tools

Broom

Sledge Hammer

Cold chisel

Hammer

Chisel

Paint scraper

Ozioto Drill

Gorilla stand

 

Steps

Step 1

The project took around 3 and a half months, There was some waiting times amongs that for things like the Stone Benchtop install and Plumbing plus sanding and varnishing the floor. I thought it went along pretty smoothly and in a timely manner. 

Too many take away meals and breakfasts cooked on a little double hotplate in the loungeroom is something I do remember :smile:

 

I do remember trying to revist everything that we had in the kitchen and deciding if it was needed in the new kitchen. I did loose that battle lol Why build cupborads for stuff we never use was my way of thinking.

01 02-06-2009.jpg

The Dining room was merged with the kitchen to give a continuence and also create space and storage.

02 02-06-2009.jpg

Yes... It was a kitchen from 2009 :smile: Well a kitchen from the 70's

03 02-06-2009.jpg

The carpet was interesting, One reason I liked the housewas you could see underneath it and it was all floorboards.

04 02-06-2009.jpg

The felt underlay was a surprise as it did not want to come up easily, this is just the fuzz that was left. The sanders told me it "wouldnt be a problem" and they were correct!

05 02-06-2009.jpg

The main question was how to have a kitchen in use and pull it apart at the same time...  And also remember to remove the tacks from the edges of the old capeted area.

06 02-06-2009.jpg

Floorboards, I think They were cyprus pine. The black dots all over the floor are heavy duty staples to hold the masonite in place.

07 02-06-2009.jpg

It was painful removing all the staples. Did it but there were a LOT.

08 02-06-2009.jpg

Empty Kitchen! Time to remove it.

09 02-06-2009.jpg

Removing that one overhead glass cabinet really gave space to the overall room.

Step 2

Removing the tiles was the next step, I remember not looking forward to that as I was concerned about damaging the plaster (yeah insert laughter at this point)

10 08-06-2009.jpg

20mins into the job and already multiple holes... The tiles were secure!

11 08-06-2009.jpg

Tools that worked best were the cold chisel or the paint scraper to remove but both still ended up breaking the plaster.

12 08-06-2009.jpg

Gave up caring at this point as i knew I would have to replace it anyway.

13 09-06-2009.jpg

Tiles gone, cupboards gone...

15 09-06-2009.jpg

Other side

16 09-06-2009.jpg

Always the go to tools...

17 09-06-2009.jpg

Main tools for dismantling....

18 09-06-2009.jpg

No way could I carry the oven/stove out so dismantled it to make it easier to carry downstairs.

19 12-06-2009.jpg

It felt really nice removing the old kitchem...

20 12-06-2009.jpg

Note the mess of glue/backing on the wall from the tiles...

21 12-06-2009.jpg

Yep, thats the outside wall :surprised: Brick veneer is exactly that.

22 12-06-2009.jpg

The missing plaster on the right was an "oops" while trying to leaver out the plaster next to it...

23 12-06-2009.jpg

I bought "patches" to fix the holes.. I thought this was the easiest as they fitted into the car.

24 14-06-2009.jpg

Afterwards I was kicking myself, a new sheet across the width would have been a whole lot less effort. 

25 14-06-2009.jpg

This was a different material, I wasnt sure what it was so it stayed.

26 14-06-2009.jpg

Ready to be repaired.

27 15-06-2009.jpg

As you can see I hadnt cut plaster before... I used a hacksaw blade! Fast forward a decade and I scour the line with a knife and "snap" It works a charm...

28 15-06-2009.jpg

Patching away... Must admit I was happy with my skill level at that point.

30 15-06-2009.jpg

Temporary making safe the powerpoint (yes I am a sparky :surprised: ) The rear was wrapped in tape so nothing could be touched.

31 16-06-2009.jpg

Patchwork quilt comes to mind....

33 19-06-2009.jpg

Another hole made for the power for the stove to come up. I didnt want it to come through the floor as that would be dodgy and also if I ever move the stove it could be problematic so through the wall it was. I couldnt drill from underneath due to the way the wall was constructed so I had to cut a hole for the body of the drill to fit in and then cut some more as it wouldnt quiet fit...

Step 3

There was a lot of sanding in bringing the patches I had done back to feeling smooth, I should have used more mud over a wider area to really help feather it in. This was my first plastering experience.

37 19-06-2009.jpg

Was cursing at having to cut another hole...

39 22-06-2009.jpg

You cant see it but I had repaired the hole from the old exhaust fan for the kitchen. Overhead sanding is hard work. Prepping for the undercoat of the rooms.

40 22-06-2009.jpg

Ahhh The "repair" Not my greatest work I must admit.  I did eventually get it almost smooth. Same rule as before, more mud/plaster over a wider area when joining and that way you dont get that ridge effect.

42 22-06-2009.jpg

Covering the windows so paint dosnt get on them.... Looking back what was I thinking!

43 22-06-2009.jpg

First coat... I had the 1000W Hallogen light keeping the place warm as it was winter while we were working... Not such a great idea having the room sealed up the way I did as the humidy went high, the paint actually dripped overnight  and the next day it felt and looked like a mess!

44 22-06-2009.jpg

Dont look too closely 😕

45 23-06-2009.jpg

Second coat covered a lot of the issues up after sanding the drip lines. Yes I was kicking myself. Rushing a job and also sealing the room tight with the heater/light going was the cause. We were having a party in a few weeks and wanted it done before hand.

46 23-06-2009.jpg46 24-06-2009.jpg

Could still see the faint outlines of the old paint job...

48 24-06-2009.jpg

The paints name is "Olive Green"

49 24-06-2009.jpg

Better showing of the Olive green and the Celery Green that we used for the sink/window wall. I trully cannot remember why the two colours were chosen, all I remember is the 3 hr discussion the night before and the 2 hr discussion of colours at Bunnings the next day... lol

50 24-06-2009.jpg

The lines are actually shadows.. Even tho it looks like discolurations

51 24-06-2009.jpg

I think the darker colurs were chosen to give seperation to the cooking kitchen and the dining kitchen feel.

52 24-06-2009.jpg53 24-06-2009.jpg

Looking back "What were we thinking!" lol Tho it was all the rage back 2009

54 24-06-2009.jpg55 24-06-2009.jpg

Final coat, so thats 4 coats all up just to remove that brown paint...

56 25-06-2009.jpg57 25-06-2009.jpg

Second coat removed all the lines.

58 25-06-2009.jpg

I really didnt mind the two shades of green, it made it less intense as well as giving that "pop" of colour.

59 25-06-2009.jpg60 25-06-2009.jpg

Things I wouldnt do again, Seal the windows up so much with the plastic, I would just cut the paint in and maybe tape/paper the edge of the timber instead. Also Not to paint at 11pm at night in mid winter. The paint wont dry easily.

Step 4

Time for the floors to be sanded back and polished.

61 26-06-2009.jpg

From memory it was a polyurethane and the colour was as light as I could go.

62 26-06-2009.jpg

It was so strong in the house I would recomend stay away for the weekend after the varnishing. It was eye watering

63 26-06-2009.jpg64 29-06-2009.jpg

The window sills that went going to be done were bumped up the list once I realised that "contact" had been put over the rough timber... (You know the stuff you put on books? Yeah that stuff)

65 29-06-2009.jpg

Sanded! It was a lot of effort but worth it. The original style of the windows when they went in had a real rough textured look.

67 30-06-2009.jpg

Putting the flatpacks together. 

68 30-06-2009.jpg

First one done, The instructions were simple, as long as I followed them it went smoothly. As soon as I "knew better and presumed" things did not match up :smile:

69 30-06-2009.jpg

I do remember the whole flatpack for the corners was heavy to carry up a flight of stairs...

70 30-06-2009.jpg

I was really surprised how easily they went together. I used my power drill on low and went slow (The torqued scew drivers were still away off back then) I also just used a large phillips head screwdriver...

71 30-06-2009.jpg

Corner units done!

72 04-07-2009.jpg

New Skirting board 

73 04-07-2009.jpg

Time for the draw rails to be installed. It went really easily, The instructions were comprehensive.

74 05-07-2009.jpg

So many draws to put together, In the end it was just a production line. "So many screws" is a quote from when I was installing them lol

75 05-07-2009.jpg

Starting to run out of room :surprised:

76 05-07-2009.jpg

The adjustable feet were amazing. It was one thing I was worried about as in "How do I get it all the same height?" Do I need to worry about a particular height? what is covered by the bottom ? In the end the feet are large screws really, and infintly adjustable by hand, the "kick board" could be cut to size and the height of the bench was a standard height.

77 05-07-2009.jpg

Joining the Carcasses together. It really becomes a complete solid set at this point. The cupboards had all been leveled before hand. 

78 05-07-2009.jpg

There are "spaces" that could be used to fill in the 20mm/40mm diffence in the width of the room. Surprisingly I found out that standard rooms are standard sizes and the kaboodle cupboards are standarsd sizing that all fits together so nicely. Sounds simple but I was stressed up until that point.

79 05-07-2009.jpg

You can see that thin gap between the middle Carcass and the corner unit on the right, I put a 20mm spacer in there and left 5mm either side of the corner units against the wall. It was at this point I realised that walls are not square to each other or even true vertical sometimes :surprised:

80 06-07-2009.jpg

Dining room cabinets going in.

81 06-07-2009.jpg

So many flatpacks to put together.

82 10-07-2009.jpg

The sink cupboard going in. It fitted nicely.
Thinks to note tho. When you buy a sink remember to figure if it will "sit" inside the cabinet nicely, if the edge will be to close to the timber support and the weight of the sink/benchtop is ok. I had to modify that front rail and put in a small piece that was vertical to it to give it an L shape for added support.

83 10-07-2009.jpg

Matching all the holes was a lesson in maths....

84 08-07-2009.jpg

Where do you store the shells until you are ready?...

85 10-07-2009.jpg

:smile: So close I just wanted to work faster

86 10-07-2009.jpg

The gap between them is where the Oven will fit.

87 10-07-2009.jpg

For all the fancy dinner plates and tupperware that dosnt get used often....

88 10-07-2009.jpg

Extremely happy with myself. 

89 10-07-2009.jpg

Could really feel the "shape" the area was turning into.

 

Step 5

Time for the Benchtops to be installed. We chose Ceaser Stone, an engineered product.  It was almost half of what the whole kitchen cost to do. $3500 I think it was.

90 29-07-2009.jpg

The fitters working out the cuts for the sink.

91 29-07-2009.jpg

I was really happy with how the company worked and how it looked. They were surpprised that I had it so level, I think It was out 3mm side to side all up which was ok. My mind went from its level with my little 1m level and they brought in a 2.4m level.... hahahah I went Ohhhh . Lucky for me I had spent a lot of time getting it right.

92 29-07-2009.jpg93 29-07-2009.jpg

Yes they were cheeky but they knew their stuff.

94 29-07-2009.jpg

level...

95 29-07-2009.jpg

Seriously was so happy with the bench. The offcut they smoothed and gave to us as well. 

96 29-07-2009.jpg

The dining room side matched the kitchen side.

97 29-07-2009.jpg

Next step will be the draws and doors...

98 29-07-2009.jpg99 31-07-2009.jpg

I spent a long time putting things together, well maybe not weeks but days...

100 31-07-2009.jpg

 

101 31-07-2009.jpg

The doors went easily in, they "clicked" and were in. The adjustment then took a little to figure out and from that point on it was easy. Ask me today which screw does what I wont remember but doing a whole kitchen you remember at the time :smile:

102 31-07-2009.jpg

The doors went on very easily.

103 31-07-2009.jpg

Really starting to flesh the kitchen out

104 31-07-2009.jpg

Was feeling very happy with myself until.. those draws...

105 31-07-2009.jpg

Very happy with it....

106 02-08-2009.jpg

Learning curve moment number 3? 4? The draw faces I should have done before the benchtop went in, at least it would have been easier that is. The draw rails are all pre marked ect so no problems. The draw "faces" tho wernt... How do you make sure the face is square to the cupboard and also the draw below, you use clamps.  1st draw, second, third no problem and then you get to the top... You cant use a clamp as the bench top is in the way.... Back to using good old maths to figure out where what fits..

107 02-08-2009.jpg

The coins I used as spacers. It worked really well.

108 02-08-2009.jpg

My jig I made to keep all the handles in the same place as well as have the draw face in the right place.

109 02-08-2009.jpg

If you look just under the sink you will see my strengthing modification to carry the load of the stone bench plus sink plus someone leaning against it. If we had gone for thicker stone then it probarly wouldnt be needed. 

110 02-08-2009.jpg

All done... Well the bottom part that is..

111 02-08-2009.jpg

Pretty happy with how it looks.

112 02-08-2009.jpg

No kickboards yet

113 02-08-2009.jpg

It made for a seemless area.

114 09-08-2009.jpg

Was pretty happy with the oven, the old ones grill never worked so I was looking forward to cooking with this.

115 09-08-2009.jpg

The oven really fitted in nicely with the benches, I made sure that the waterfall edges were in with a 10mm space each side.

116 09-08-2009.jpg

Sink all plumbed in and working nicely.

117 09-08-2009.jpg

Because we had gone so close to the edge of the cavity space putting in the little clasps that hold the sink down in place was fiddly but do-able. It just took awhile to get them in.

Step 6

Time for the top cupboards to be done... I was nervous at this part as "How do you hold the cupboards up so they are level and also three at at time? I knew there was "lifters" you could buy but they were pricey and $120ea I think from memory... I figured away around them as I am sure others had done the same thing.

118 15-09-2009.jpg

Next batch of flatpacks being assembled. We were running out of money so the stress was building up to get it finished.

119 15-09-2009.jpg

The solution to how to keep the cupboards level while installing them.... A flat piece of timber screwed into the studs behind the plaster. And yes I knew were the studs were as I had made sure to leave pencil marks up top from when I did the replastering of the wall.

120 15-09-2009.jpg

The rail is level :smile:

121 15-09-2009.jpg

Carcass made, time to mount them in place. I placed them up, Friends held it pressure wise against the wall and I screwed through the backplane of the cupboard into the studs.

122 15-09-2009.jpg

First one done... Cheering in my head with sweat on my brow!

123 15-09-2009.jpg

Second one ready to go...

124 15-09-2009.jpg

Oh yeah... feeling happy with myself :smile:

125 15-09-2009.jpg

Two is in!

126 15-09-2009.jpg

Three is in! Number two and number three were upside down..... Didnt realise it until I took away the timber strip and you could see the rough back edge of the carcuss

127 15-09-2009.jpg

I had a mate comment and say the house was designed for the kaboodle cupborads :smile: Here is my reply
"I actually think that most kitchens will work out as the cupboards come in a range of sizes, we were lucky that its 2720mm across (now how come i can rem that! lol) but those two cupboards on the right are upside down! the very back panel has one smooth edge and should be underneath! lol its on top and nope not changing it! going to have a strip lighting there anyway but man felt stupid after we took the rail away!"

128 15-09-2009.jpg

Feeling happy no matter what even tho out of the four shells I only had one the right way up first time lol

129 15-09-2009.jpg

Almost done, doors and shelves are all thats left.

130 15-09-2009.jpg131 15-09-2009.jpg

Fixing the doors in place. 

132 15-09-2009.jpg

The frosted glass look was all the rage in 2009, I was intending to put lights inside but decided against it as you could still see stuff in normal light anyway.

133 15-09-2009.jpg

Almost back to being a fully functional kitchen...

134 15-09-2009.jpg

Time to bring back the clutter that makes the kitchen your own.

135 15-09-2009.jpg

Perfect use for the offcut stone. 

136 15-09-2009.jpg

Kitchen back in service and cupboards filling up...

137 15-09-2009.jpg

I was really happy with how it all worked out. Total strip down and build time was three and a half months which felt like ages but looking back it was fast.

I never got around to installing the kickboards, or finishing the new hole for the exhaust fan and replacing the overhead fan before we sold the house. The exhaust fan only needed a hole cut as it was cabled ready to go.

 

Some reasoning behind doing all the floor and painting all the walls. I figured if we ever changed the layout or decided to remove part of the kitchen it would be wise for everything to be the same underneath. Especially the floor. 

Things I would change, Less clutter old items that never get used again would be left out :smile: Painting in the middle of the night, and One sheet of plaster instead of multiple sheets.

 

EricL
Bunnings Team Member
Bunnings Team Member

Re: Kitchen Build from 2009

Hi @Dave-1 

 

That kitchen looks awesome! Your assembly technique for the wall cabinets was really clever.  I may have to borrow that technique when the time comes for me to renew the kitchen. 

 

Thanks for sharing such a wonderful project.

 

Eric

 

See something interesting? Give it the thumbs up!
Lease
Finding My Feet

Re: Kitchen Build from 2009

Thank you for sharing this. I am lost and overwhelmed when it comes to my kitchen and this was very inspiring.

Dave-1
Community Megastar

Re: Kitchen Build from 2009

Evening @Lease 

Thank you :smile:

Step by step is how I get through the scary parts of the project.

Break it down to a smaller chunk for every roadblock you think of. 

And ask us :smile: So many in here have done kitchens or part kitchens or even Laundrys and mudrooms :smile:

 

They use to supply graph paper with the Kaboodle kitchens, nowadays I think its something else. Take a old note pad with you to coffee and start off with a list of things you would like in your kitchen, then a list of kitchen machines you have. Pretty soon you will know what you need. Then day dream sketch, dosnt have to be exact or even fit but just picture in your mind. 

 

Ikea (shhhhh) have good looking kitchens to wander through as well :smile: Bunnings do have nice ones but its nice to compare. Or find a housing display village near you :smile: I have done that before and the best part is they are on trend for sure!  :smile:

 

Dave

 

 

Dave-1
Community Megastar

Re: Kitchen Build from 2009

Thank you @EricL 

I was telling my sister about the project today and commenting that it looks a little dated in the photos :smile: She reminded me that it "looked awesome" when I had finished it :smile:

 

I would change a few things in the way I would design a kitchen now... Might get to start it this year even or maybe next year. Definently looking forward to it tho.

 

Dave

EricL
Bunnings Team Member
Bunnings Team Member

Re: Kitchen Build from 2009

Hello @Lease 

 

Welcome to the Bunnings Workshop community. It's sensational to have you join us.

 

It's great that you found @Dave-1's kitchen project inspirational. Are you planning on a kitchen renovation yourself? If you are, please don't forget to post photo updates of your project. I'm sure our members will be keen to see how you'll be updating your kitchen.

 

Eric

 

See something interesting? Give it the thumbs up!

Why join the Bunnings Workshop community?

Workshop is a friendly place to learn, get ideas and find inspiration for your home improvement projects